Introduced
Committee
Markup
Reported
Floor
Passed
Enacted
HR.3616 119th Congress

Reliable Power Act (HR 3616)

Reliable Power Act

Status
Passed Chamber
Latest Action
2025-12-18
Sponsor
Balderson, Troy (R-Ohio)
Official Source
Investability
0/100
Stage
PASSED_ONE
Related Bills
1
Full Text
5,871 chars
Alive
Yes
GovGreed Synthesis · 2025-12-18
Reliable Power Act This bill directs the electric reliability organization (i.e., the North American Electric Reliability Corporation) to conduct annual long-term assessments of the reliability of electric power in the bulk-power system. It also establishes a process for the Federal Energy Regulatory Commission (FERC) to review federal regulations before they are finalized if the electric reliability organization finds that the system is at risk of not having sufficient electric generation to maintain reliability. If the electric reliability organization finds that the system does not have sufficient generation to maintain reliability, it must notify FERC that the bulk-power system is in a state of generation inadequacy. FERC must then notify the Department of Energy, the Environmental Protection Agency, and any other appropriate federal agencies of the generation inadequacy. Upon receiving the notice, the federal agency must provide proposed regulations that affect any generation resource in the bulk-power system to FERC for review and comment. If applicable, FERC must provide recommendations to modify the regulations. Federal agencies may not finalize such a regulation until FERC finds that it will not be likely to have a significant negative impact on the ability of the bulk-power system to supply sufficient electric energy necessary to maintain an adequate level of reliability.
2025-12-18
Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.
2025-12-17
On passage Passed by the Yeas and Nays: 225 - 203 (Roll no. 347). (text of amendment in the nature of a substitute: CR H6000)
2025-12-17
DEBATE - The House proceeded with one hour of debate on H.R. 3616.
2025-12-17
Considered as unfinished business. (consideration: CR H6006)
2025-12-17
At the conclusion of debate on H.R. 3616, the Chair put the question on passage of the bill and by voice vote announced the ayes had prevailed. Mr. Weber (TX) demanded the yeas and nays and the Chair postponed further proceedings until a ti
2025-12-17
The previous question was ordered pursuant to the rule.
2025-12-17
Passed/agreed to in House: On passage Passed by the Yeas and Nays: 225 - 203 (Roll no. 347).
2025-12-17
Rule provides for consideration of H.R. 4776, H.R. 1366, H.R. 845, H.R. 3616, H.R. 3632 and H.R. 4371. The resolution provides for consideration of H.R. 4776, under a structured rule and H.R. 1366, H.R. 845, H.R. 3616, H.R. 3632, and H.R. 4
2025-12-17
Considered under the provisions of rule H. Res. 951. (consideration: CR H6000-6004)
2025-12-17
Motion to reconsider laid on the table Agreed to without objection.
119 HR 3616 EH: Reliable Power Act U.S. House of Representatives text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. IB 119th CONGRESS 1st Session H. R. 3616 IN THE HOUSE OF REPRESENTATIVES AN ACT To require the Federal Energy Regulatory Commission to review regulations that may affect the reliable operation of the bulk-power system. 1. Short title This Act may be cited as the Reliable Power Act . 2. Commission review and comment for covered agency actions Section 215 of the Federal Power Act ( 16 U.S.C. 824o ) is amended— (1) in subsection (g)— (A) by striking The ERO and inserting the following: (1) In general The ERO ; and (B) by adding at the end the following: (2) Annual long-term assessment The assessments under paragraph (1) shall include an annual long-term assessment, which shall include— (A) an analysis of the ability of the bulk-power system to supply sufficient electric energy necessary to maintain an adequate level of reliability, taking into account generation resource mix, transmission development, and electric energy demand trends; (B) an analysis of the risk of future electric energy supply shortfalls under normal and extreme weather conditions, and the risk of any such shortfalls within each region of the bulk-power system; and (C) a determination of whether additional generation resources are necessary to supply sufficient electric energy to maintain an adequate level of reliability during the assessment period. (3) Notice of generation inadequacy In conducting a long-term assessment under paragraph (2), if the ERO finds that the bulk-power system is at risk of not having adequate generation resources to supply sufficient electric energy to maintain an adequate level of reliability, the ERO shall publicly notify the Commission that the bulk-power system is in a state of generation inadequacy. (4) Data collection To conduct a long-term assessment under paragraph (2), the ERO may collect information and data from users, owners, and operators of the bulk-power system. ; (2) by redesignating subsections (h) through (k) as subsections (i) through (l), respectively; and (3) by inserting after subsection (g) the following: (h) Commission review and comment for covered agency actions (1) Notice to federal agencies If the ERO notifies the Commission under subsection (g)(3) that the bulk-power system is in a state of generation inadequacy, the Commission shall promptly notify the Department of Energy, the Environmental Protection Agency, and any other Federal agency the Commission determines appropriate of such state of generation inadequacy. (2) Submission Upon receiving notice under paragraph (1), the head of each Federal agency that received such notice shall provide to the Commission for review and comment any covered agency action by the Federal agency— (A) on the first date on which such covered agency action is provided to the Office of Management and Budget or any other Federal agency for review and comment; or (B) if such covered agency action is not provided to the Office of Management and Budget or any other Federal agency for review and comment, not later than 90 days before the date on which the covered agency action is published in the Federal Register or is otherwise made available for public inspection or comment. (3) Commission comments The Commission, in consultation with the ERO and transmission organizations, shall, by order, provide to the agency head that provided to the Commission a covered agency action under paragraph (2)— (A) comments on such covered agency action, which such comments may include an assessment of the effect of the covered agency action on rates, terms, and conditions for services pursuant to the authority of the Commission under sections 201 and 206; and (B) if applicable, recommendations for modifications to the covered agency action to prevent a significant negative impact on the ability of the bulk-power system to supply sufficient electric energy necessary to maintain an adequate level of reliability. (4) Agency response The head of a Federal agency may not finalize a covered agency action that is provided to the Commission under paragraph (2) until— (A) the agency head responds in writing to the Commission with an explanation of how the agency head modified, or why the agency head determined not to modify, such covered agency action in response to any comments and recommendations provided by the Commission under paragraph (3); and (B) the Commission finds that the covered agency action will not be likely to have a significant negative impact on the ability of the bulk-power system to supply sufficient electric energy necessary to maintain an adequate level of reliability. (5) Public availability of comments and responses An agency head shall include any comments, recommendations, and responses for the covered agency action when— (A) submitting the covered agency action to the Federal Register for publication; or (B) otherwise making the covered agency action available for public inspection or comment. (6) Definitions In this subsection: (A) Covered agency action The term covered agency action means a regulation that— (i) relates to, or otherwise directly affects, any generation resource in the bulk-power system; and (ii) is under development to be proposed or otherwise under consideration in a rulemaking prior to finalization on the date on which the Federal agency receives notice from the Commission under paragraph (1). (B) Federal agency The term Federal agency means an Executive department (as that term is defined in section 101 of title 5, United States Code) or any other Executive agency that is in the President’s cabinet. . Passed the House of Representatives December 17, 2025. Kevin F. McCumber, Clerk.
🔒 GovGreed Pro · Trading Intelligence on HR.3616 Get Access — $24.50/mo
Loading intelligence layer…
Bill text sourced from GovInfo.gov · public domain · last updated 2025-12-18.
Plain-English summary, score breakdown, and trading-intelligence panels are GovGreed-original analysis derived from STOCK Act filings, SEC Form 4 disclosures, FEC contributions, and Senate LDA lobbying reports — all publicly filed federal records.
GovGreed is not affiliated with the U.S. Government. Not financial advice.