What This Bill Does · Plain English
Summary
Plain-English summary not yet available for this bill. Check back after our next analysis run.
Action Timeline
2026-03-17
Committee on Energy and Natural Resources Subcommittee on Water and Power. Hearings held.
2026-01-29
Read twice and referred to the Committee on Energy and Natural Resources.
2026-01-29
Introduced in Senate
Frequently Asked Questions
Did S.3743 pass?
S.3743 is still alive. Current stage: MARKUP. Pass likelihood: pending.
Who sponsored S.3743?
S.3743 was sponsored by Mike Lee (R-Utah).
Full Bill Text
119 S3743 IS: To direct the Secretary of the Interior to carry out a feasibility study on a selective water withdrawal system at Glen Canyon Dam, and for other purposes. U.S. Senate 2026-01-29 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. II 119th CONGRESS 2d Session S. 3743 IN THE SENATE OF THE UNITED STATES January 29, 2026 Mr. Lee introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources A BILL To direct the Secretary of the Interior to carry out a feasibility study on a selective water withdrawal system at Glen Canyon Dam, and for other purposes. 1. Glen Canyon Dam selective water withdrawal system feasibility study (a) In general The Secretary of the Interior (acting through the Commissioner of Reclamation) (referred to in this section as the Secretary ), in consultation with the Secretary of Energy and Colorado River Storage Project power contractors, shall carry out a feasibility study (including all hydrological modeling) on a selective water withdrawal system at Glen Canyon Dam to optimize hydropower generation when releasing cold water from Glen Canyon Dam, while also preventing entrainment of invasive species, pursuant to the 2016 Long-Term Experimental and Management Plan Record of Decision and the 2024 Long-Term Experimental and Management Plan Supplemental Environmental Impact Statement and Record of Decision. (b) Feasibility determination If the Secretary determines that a selective water withdrawal system alternative studied under subsection (a) is feasible under the reclamation laws, the Secretary may, if the Colorado River Storage Project power contractors concur with the alternative chosen, begin compliance with, and construction of, the chosen alternative. (c) Feasibility study deadline The Secretary shall complete the feasibility study required under subsection (a) not later than 18 months after the date of enactment of this Act. (d) Funding (1) In general The costs of the feasibility study under subsection (a) shall be paid for by the Secretary using appropriated funds. (2) Treatment of funds Any Federal funds made available to carry out this section shall be nonreimbursable and nonreturnable to the United States. (3) Identification of funds Not later than 90 days after the date of enactment of this Act, the Secretary, in consultation with the Secretary of Energy and Colorado River Storage Project power contractors, shall identify sources of available funds to carry out this section. (e) Effect Nothing in this section affects the post-2026 Colorado River reservoir operations guidelines and strategies for Lake Powell and Lake Mead in effect before, on, or after the date of enactment of this Act.
Loading intelligence layer…