What This Bill Does · Plain English
GovGreed Synthesis · AI extraction
This bill authorizes the Secretary of the Interior to conduct a feasibility study, in consultation with a nonprofit corporation, for constructing a water supply project to serve municipal, rural, and industrial users in a four-state region (South Dakota, Iowa, Nebraska, Minnesota). It authorizes $10 million for the study, with the federal share capped at 50% of the total cost, and the authority to conduct the study expires 10 years after enactment.
Carveouts & Earmarks · 1 line items · $10M tagged
Specific dollar amounts in this bill that flow to identifiable companies or programs — the actual cash trail.
$10M
Sec.3
"There is authorized to be appropriated to the Secretary to carry out this section $10,000,000."
→ the Secretary
Action Timeline
2026-03-17
Committee on Energy and Natural Resources Subcommittee on Water and Power. Hearings held.
2026-01-29
Read twice and referred to the Committee on Energy and Natural Resources.
2026-01-29
Introduced in Senate
Frequently Asked Questions
Did S.3736 pass?
S.3736 is still alive. Current stage: MARKUP. Pass likelihood: pending.
What does S.3736 do?
This bill authorizes the Secretary of the Interior to conduct a feasibility study, in consultation with a nonprofit corporation, for constructing a water supply project to serve municipal, rural, and industrial users in a four-state region (South Dakota, Iowa, Nebraska, Minnesota). It authorizes $10 million for the study, with the federal share capped at 50% of the total cost, and the authority to conduct the study expires 10 years after enactment.
Who sponsored S.3736?
S.3736 was sponsored by Mike Rounds (R-South Dakota).
How much money does S.3736 spend?
S.3736 contains $10M in identified line-item carveouts to specific programs and companies, across 1 earmarks.
Full Bill Text
119 S3736 IS: Dakota Mainstem Water Supply Project Feasibility Study Act U.S. Senate 2026-01-29 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. II 119th CONGRESS 2d Session S. 3736 IN THE SENATE OF THE UNITED STATES January 29, 2026 Mr. Rounds (for himself and Mr. Thune ) introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources A BILL To require the Secretary of the Interior to conduct a study to determine the feasibility of constructing a project to supply municipal, rural, and industrial water to the Dakota Mainstem Regional Water System service area in the States of South Dakota, Iowa, Nebraska, and Minnesota, and for other purposes. 1. Short title This Act may be cited as the Dakota Mainstem Water Supply Project Feasibility Study Act . 2. Definitions In this Act: (1) Dakota Mainstem Regional Water System The term Dakota Mainstem Regional Water System means the Dakota Mainstem Regional Water System, Inc., a nonprofit corporation established and operated substantially in accordance with the reclamation feasibility standards to serve as a non-Federal project entity for purposes of the cooperative agreement entered into under section 3(a)(1). (2) Reclamation feasibility standards The term reclamation feasibility standards means the eligibility criteria and feasibility study requirements described in part 404 of title 43, Code of Federal Regulations (or successor regulations). (3) Secretary The term Secretary means the Secretary of the Interior. 3. Dakota Mainstem water supply project feasibility study (a) Study (1) In general The Secretary, in consultation with the Dakota Mainstem Regional Water System, through a cooperative agreement, may undertake a study to determine the feasibility of constructing a project to supply municipal, rural, and industrial water to the Dakota Mainstem Regional Water System service area in the States of South Dakota, Iowa, Nebraska, and Minnesota. (2) Requirement The study under paragraph (1) shall comply with the reclamation feasibility standards. (b) Federal share The Federal share of the total costs of carrying out the feasibility study under this section shall not exceed 50 percent. (c) Authorization of appropriations There is authorized to be appropriated to the Secretary to carry out this section $10,000,000. (d) Termination of authority The authority provided by this section expires on the date that is 10 years after the date of enactment of this Act.
Loading intelligence layer…