What This Bill Does · Plain English
Summary
Plain-English summary not yet available for this bill. Check back after our next analysis run.
Action Timeline
2026-01-29
Introduced in Senate
2026-01-29
Read twice and referred to the Committee on Commerce, Science, and Transportation.
Frequently Asked Questions
Did S.3728 pass?
S.3728 is still alive. Current stage: COMMITTEE. Pass likelihood: pending.
Who sponsored S.3728?
S.3728 was sponsored by Tim Sheehy (R-Montana).
Full Bill Text
119 S3728 IS: Long-Distance Corridor Relief Enhancement Act U.S. Senate 2026-01-29 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. II 119th CONGRESS 2d Session S. 3728 IN THE SENATE OF THE UNITED STATES January 29, 2026 Mr. Sheehy (for himself and Mr. Merkley ) introduced the following bill; which was read twice and referred to the Committee on Commerce, Science, and Transportation A BILL To remove the requirement that the Secretary of Transportation consider the committed or anticipated non-Federal funding for long distance intercity passenger rail routes under the Corridor Identification and Development Program. 1. Short title This Act may be cited as the Long-Distance Corridor Relief Enhancement Act . 2. Modification of consideration requirement of non-Federal funding for corridor selection Section 25101(c) of title 49, United States Code, is amended— (1) by redesignating paragraphs (1) through (14) as subparagraphs (A) through (N), respectively, and indenting such subparagraphs, as so redesignated, 2 ems to the right; (2) in the matter preceding subparagraph (A), as so redesignated, by striking In selecting and inserting the following: (1) In general In selecting ; (3) in subparagraph (F), as so redesignated, by striking committed or and by inserting except as provided in paragraph (2), committed or ; and (4) by adding at the end the following: (2) Exception for long-distance route corridor (A) In general For the purposes of this subsection, the Secretary shall not require or consider committed or anticipated non-Federal funding for any part of the program described in subsection (a) for any intercity passenger rail corridor on a long-distance route. (B) Application The exception provided in subparagraph (A) shall apply to any long-distance route corridor accepted into the program on or after October 1, 2023. .
Loading intelligence layer…