What This Bill Does · Plain English
Summary
Plain-English summary not yet available for this bill. Check back after our next analysis run.
Action Timeline
2025-07-16
Read twice and referred to the Committee on Finance.
2025-07-16
Introduced in Senate
Frequently Asked Questions
Did S.2304 pass?
S.2304 is still alive. Current stage: COMMITTEE. Pass likelihood: pending.
Who sponsored S.2304?
S.2304 was sponsored by Mark R. Warner (D-Virginia).
Full Bill Text
119 S2304 IS: Methane Reduction and Economic Growth Act U.S. Senate 2025-07-16 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. II 119th CONGRESS 1st Session S. 2304 IN THE SENATE OF THE UNITED STATES July 16, 2025 Mr. Warner (for himself and Mrs. Capito ) introduced the following bill; which was read twice and referred to the Committee on Finance A BILL To amend section 45Q of the Internal Revenue Code of 1986 to establish the mine methane capture incentive credit. 1. Short title This Act may be cited as the Methane Reduction and Economic Growth Act . 2. Mine methane capture incentive credit (a) In general Section 45Q(f) of the Internal Revenue Code of 1986 is amended by adding at the end the following new paragraph: (10) Methane capture (A) In general In the case of qualified methane— (i) paragraph (4) of subsection (a) shall be applied— (I) by substituting per metric ton of CO2e (as defined in section 45Z(d)(2)) of qualified methane for per metric ton of qualified carbon oxide , (II) by substituting methane capture equipment for carbon capture equipment , and (III) by applying the following in lieu of subparagraph (B) thereof: (i) either— (I) injected by the taxpayer for energy use— (aa) in a pipeline which satisfies the pipeline integrity management guidelines of section 192 of title 49, Code of Federal Regulations, and is in compliance with instrumental leak monitoring and other preventive and mitigative measures under section 192.935 of title 49, Code of Federal Regulations, or (bb) in a gathering system that feeds a pipeline described in subclause (I), or (II) otherwise used for producing heat (for industrial use or to heat a structure) or other energy, in a manner that does not involve more than de-minimis release of methane into the atmosphere. , (ii) the term qualified facility shall mean any individual source of qualified methane such as borehole, well, or vent shaft constructed at a mining facility— (I) the construction of which begins before January 1, 2036, (II) for which construction of methane capture equipment begins before such date, and (III) which captures not less than 2,500 metric tons of CO2e methane during the taxable year, (iii) subsection (b)(2)(A)(ii) shall be applied by substituting the greatest amount of methane captured at such facility in any year ending prior to for the total amount of the carbon dioxide capture capacity of the carbon capture equipment in service at such facility on the day before , and (iv) this section shall be applied by substituting methane capture for carbon capture and qualified methane for qualified carbon oxide in subsection (b)(2), (f)(1), (h), and (i)(1). (B) Qualified methane defined For purposes of this paragraph, the term qualified methane means any methane which— (i) is captured from mining activities, including underground mines, abandoned or closed mines, or surface mines, by methane capture equipment, (ii) would otherwise be released into the atmosphere as industrial emission of greenhouse gas or lead to such release, and (iii) is measured at the source of capture and verified at the point of injection or utilization. (C) Methane capture equipment defined For purposes of this paragraph, the term methane capture equipment means equipment built to connect a qualified facility to— (i) a preexisting or new pipeline system, or (ii) to energy generation equipment, to capture qualified methane from such source. . (b) Effective date The amendments made by this section shall apply to qualified methane captured after December 31, 2024.
Loading intelligence layer…