What This Bill Does · Plain English
Summary
Plain-English summary not yet available for this bill. Check back after our next analysis run.
Action Timeline
2025-04-10
Read twice and referred to the Committee on Commerce, Science, and Transportation.
2025-04-10
Introduced in Senate
Frequently Asked Questions
Did S.1479 pass?
S.1479 is still alive. Current stage: COMMITTEE. Pass likelihood: 34%.
Who sponsored S.1479?
S.1479 was sponsored by Roger F. Wicker (R-Mississippi).
Full Bill Text
119 S1479 IS: Building Out Optimized Space Testing for Engines Act U.S. Senate 2025-04-10 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. II 119th CONGRESS 1st Session S. 1479 IN THE SENATE OF THE UNITED STATES April 10, 2025 Mr. Wicker introduced the following bill; which was read twice and referred to the Committee on Commerce, Science, and Transportation A BILL To require the Administrator of the National Aeronautics and Space Administration to continue modernization efforts with respect to Federal rocket propulsion test infrastructure at National Aeronautics and Space Administration centers. 1. Short title This Act may be cited as the Building Out Optimized Space Testing for Engines Act or the BOOST for Engines Act . 2. Definitions In this Act: (1) Administrator The term Administrator means the Administrator of the National Aeronautics and Space Administration. (2) NASA The term NASA means the National Aeronautics and Space Administration. 3. Rocket engine test infrastructure (a) Modernization program The Administrator shall continue to carry out a program to modernize rocket propulsion test infrastructure at NASA facilities— (1) to increase capabilities; (2) to enhance safety; (3) to support propulsion development and testing; and (4) to foster the improvement of Government and commercial space transportation and exploration. (b) Projects Projects funded under the program described in subsection (a) may include— (1) infrastructure and other facilities and systems relating to rocket propulsion test stands and rocket propulsion testing; (2) enhancements to test facility capacity and flexibility; and (3) such other projects as the Administrator considers appropriate to meet the goals described in that subsection. (c) Requirements In carrying out the program under subsection (a), the Administrator shall— (1) prioritize investments in projects that enhance test and flight certification capabilities for large thrust-level atmospheric and altitude engines and engine systems, and multi-engine integrated test capabilities; (2) continue to make underutilized test facilities available for commercial use on a reimbursable basis; (3) evaluate NASA center-specific agreements with commercial entities to ensure that costs reflect the impacted location rather than the cost of the highest national agreement; and (4) ensure that no project carried out under such program adversely impacts, delays, or defers testing or other activities associated with facilities used for Government programs, including— (A) the Space Launch System and the Exploration Upper Stage of the Space Launch System; (B) in-space propulsion to support exploration missions; and (C) nuclear propulsion testing. (d) Rule of construction Nothing in this section shall preclude a NASA program, including the Space Launch System and the Exploration Upper Stage of the Space Launch System, from using the modernized test infrastructure developed under this section.
Loading intelligence layer…