🔓
Sign in as a Member to unlock the full view of HR.7487. · Full carveout list, all affected companies, party defectors, and 30-day trade predictions.
Become a Member$24.50/mo already a Member? Sign in →
HR.7487 · 119TH CONGRESS

Rural Jobs and Hydropower Expansion Act

Status
Reported
Latest Action
2026-05-14
Sponsor
Boebert, Lauren (R-Colorado)
Official Source
Investability
0/100
Stage
REPORTED
Related Bills
0
Full Text
3,613 chars
Alive
Yes

What This Bill Does · Plain English

Summary
Plain-English summary not yet available for this bill. Check back after our next analysis run.

Action Timeline

2026-02-11
Referred to the House Committee on Natural Resources.
2026-02-11
Introduced in House
2026-02-11
Introduced in House

Frequently Asked Questions

Did HR.7487 pass?
HR.7487 is still alive. Current stage: REPORTED. Pass likelihood: pending.
Who sponsored HR.7487?
HR.7487 was sponsored by Lauren Boebert (R-Colorado).

Full Bill Text

119 HR 7487 IH: Rural Jobs and Hydropower Expansion Act U.S. House of Representatives 2026-02-11 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. I 119th CONGRESS 2d Session H. R. 7487 IN THE HOUSE OF REPRESENTATIVES February 11, 2026 Ms. Boebert (for herself and Mr. Gray ) introduced the following bill; which was referred to the Committee on Natural Resources A BILL To amend the Reclamation Project Act of 1939 to encourage non-Federal hydropower development with respect to Bureau of Reclamation projects. 1. Short title This Act may be cited as the Rural Jobs and Hydropower Expansion Act . 2. Amendments to Reclamation Project Act Section 9(c) of the Reclamation Project Act of 1939 (53 Stat. 1194) is amended— (1) by striking (1) The Secretary is authorized and inserting The Secretary is authorized ; (2) by striking small conduit hydropower using Bureau of Reclamation facilities and pumped storage hydropower exclusively using Bureau of Reclamation reservoirs and inserting hydropower using all Bureau of Reclamation facilities ; (3) by striking No contract relating to municipal water supply and inserting the following: (1) No contract relating to municipal water supply ; (4) in paragraph (2)(A)— (A) by striking applicable transferred conduit and inserting applicable transferred works facility ; (B) by striking applicable reserved conduit and inserting applicable reserved works facility ; and (C) by striking power privilege offer for a small conduit and inserting power privilege offer for the ; (5) in paragraph (3), by striking small conduit and inserting applicable ; (6) in paragraph (4), by striking small conduit hydropower ; (7) in paragraph (6)— (A) by striking conduit before hydropower generation ; and (B) by striking transferred conduit and inserting transferred works facility ; (8) in paragraph (7), by striking conduit ; (9) in paragraph (8)— (A) by inserting (referred to in this section as an authorization ) before issued by the Federal Energy Regulatory Commission ; (B) by striking August 9, 2013, and inserting the date of the enactment of the Rural Jobs and Hydropower Expansion Act ; and (C) by adding at the end Any authorization issued by the Federal Energy Regulatory Commission with respect to a project shall remain in place until such authorization becomes inactive. As allowed by the Federal Energy Regulatory Commission, an authorization may be renewed and remain active. Once the authorization becomes inactive, project site jurisdiction shall shift to the Bureau of Reclamation exclusively. ; (10) by redesignating paragraph (9) as paragraph (10); (11) by inserting after paragraph (8) the following: (9) Nothing in this section shall expand or otherwise amend the Bureau of Reclamation lease of power privilege authorities outside the project boundary. ; and (12) in paragraph (10), as so redesignated— (A) by striking subparagraphs (A), (C), (D), and (E); (B) by redesignating subparagraph (B) as subparagraph (A); and (C) by adding at the end the following: (B) Reserved works facility The term reserved works facility means those facilities owned by the Bureau of Reclamation where the Bureau of Reclamation has retained responsibility for carrying out operation and maintenance activities. (C) Transferred works facility The term transferred works facility means a project facility where the operations and maintenance of that facility is carried out by a non-Federal entity under the provisions of a formal operations and maintenance transfer contract. .
🔒 GovGreed Pro · Trading Intelligence on HR.7487 Get Access — $24.50/mo
Loading intelligence layer…
Bill text sourced from GovInfo.gov · public domain · last updated 2026-07-28. Plain-English summary, score breakdown, and trading-intelligence panels are GovGreed-original analysis derived from STOCK Act filings, SEC Form 4 disclosures, FEC contributions, and Senate LDA lobbying reports — all publicly filed federal records. GovGreed is not affiliated with the U.S. Government. Not financial advice. [live render]